Arka Developments
Interior Fit-Out Proposal

The Modern
Barbers

A minimal luxury barber space — built to impress from day one.

Client The Modern Barbers
Date June 2026
Location Wembley, London
Prepared by Arka Developments
Our Approach

Construction that understands design.

Every decision we make is grounded in how the space will feel to the person sitting in the chair.

We've taken your brief black, grey, minimal, luxury and translated it into a buildable scope of works with two clear pricing options. Both deliver the same premium finish; the difference is in the scope of what's included.

Our team handles demolition, ceiling, walls, flooring, electrics, joinery install and the WC fit-out. The fit-out is designed to be completed within a tight programme so you can open without delay.

All pricing includes a 5% contingency. VAT is shown separately. Client supplied items (mirrors, barber chairs, wall panels, pendant lights, WC suite) are clearly flagged throughout.

~42
Total floor area
2
Layout options
5
Barber stations
3–4
Week programme
Visual Direction

Mood Board

Black and grey as a foundation. Warm lighting as the soul. No gimmicks.

Barber station row with LED mirrors Station Wall — LED Mirrors
Dark concrete ceiling barber Ceiling — Geometric LED
Arch mirror dark grey Mirror — Backlit Arch
Pulse salon round mirrors Reception — Fluted Panels
Black ceiling lights Lighting — Suspended Rails
Grey walls black joinery Joinery — Matte Black
Oval mirrors timber backdrop Stations — Oval Mirror Detail
Void Black #0D0D0D
Charcoal #1A1A1A
Graphite #3A3A3A
Ash Grey #6B6B6B
Warm White #E0DFDB
Brass Accent #A67852
Walls
Matte micro cement plaster wallpaper finish. One feature wall in dark fluted MDF panels. No gloss paint anywhere.
Floor
AC4 commercial laminate in dark oak or concrete look. Large format minimal grout lines. Threshold strips at all openings.
Lighting
Suspended geometric LED pendants on dimmer. Recessed downlights at 2700K. LED strip built into each mirror recess.
Fixtures
Matte black metal frame throughout. No chrome. Brass detailing at door hardware and shelf brackets only.
Space Planning

Layout Options

Two configurations. Both work! They serve different operational priorities.

Option 1
Stations left · Waiting right
Recommended
Layout Option 1 floor plan
  • Five barber stations along the left wall, strong focused working zone
  • Waiting sofa along the right wall, facing the barbers, clients feel part of the energy
  • Clear central circulation path from entry to WC
  • Desk and reception at front, adjacent to entrance
  • WC and wash bay consolidated at rear (1700 x 3005mm)
Option 2
Stations right · Lounge left
4 Stations
Layout Option 2 floor plan
  • Four barber stations on right wall, creates a sleek mirrored runway feel
  • Generous lounge and waiting on left, sofa and coffee table, premium arrival experience
  • Desk at front of house visible from entry, strong brand moment on arrival
  • Better acoustic separation between lounge and working zone
  • WC and wash bay at rear, identical provision to Option 1
Scope & Pricing

Quotations

Both options include the same standard of finish. Option 1 adds flooring and the full WC fit-out.

Preliminaries
£768
Demolition
£2,585
Internal & Decoration
£19,204
Contingency (5%)
£1,128
Total inc VAT
£28,422
Client to supply Mirrors (full-height, 5 no.) · Recessed LED downlight fittings (15 no.) · Pendant lights (5 no.) · Mirror LED strip fittings (5 no.) · Wall panels (8 m²) · Pantry units and worktop · WC suite · Basin · Wallpaper (54 m²)
1 — Preliminaries
Site signage, H&S notices, PPE station (CDM compliant)1 ITEM£132
Dust sheets, containment screens, shopfront glazing protection1 ITEM£180
8yd skip hire — supply, position and collection1 ITEM£456
Section total: £768
2 — Demolition
Disconnect and terminate all existing services safely1 ITEM£216
Strip all existing wallpaper from walls floor to ceiling54 m²£535
Take down existing ceiling in entirety inc. fixings, battens, debris43 m²£748
Lift and dispose of existing floor covering43 m²£439
Remove existing skirting boards throughout and dispose30 LM£306
Strip out existing toilet — WC, basin, all fittings1 ITEM£342
Section total: £2,585
3 — Internal & Decoration
Repair walls after wallpaper removal — fill, sand, prepare to smooth finish54 m²£745
Supply and install new metal frame suspended ceiling system43 m²£1,471
Fix 12.5mm fire plasterboard to ceiling frame with 3mm skim coat43 m²£1,961
Form decorative recessed niches — timber frame, plasterboard, skim3 no.£684
Hang wallpaper to all walls throughout — labour and adhesive (client supplies paper)54 m²£778
Install wall panels — fit only (client to supply panels)8 m²£173
Mist coat and 2 coats emulsion to new ceiling — Dulux Trade43 m²£748
Mist coat and 2 coats emulsion to walls where wallpaper not applied20 m²£348
Install full-height mirrors — labour, adhesive and fixings (client supplies mirrors)5 no.£480
Supply and install double socket outlet — 1st and 2nd fix inc. back boxes and faceplates15 no.£1,170
Install recessed LED downlights — 2nd fix, labour and connection only5 no.£312
Supply and install 2-gang light switch — 1st and 2nd fix8 no.£528
Install client-supplied pendant lights — back box, cable drop and connection5 no.£390
Install recessed LED strip lights into mirrors — 2nd fix, labour and connection only5 no.£330
TV back box installation and cable relocation — HDMI and power provision1 no.£342
Part P Building Regulations test and certification1 no.£336
Install pantry unit with worktop — fit only (client supply)1 no.£384
Install 2 pantry units no sink — fit only (client supply)2 no.£288
Replace full set of hinges to existing glass shopfront door1 no.£582
Clean all glazing internally and externally — remove stickers, adhesive, film1 no.£174
Floor preparation — level, prime and adhesive ready for flooring43 m²£722
Supply and lay AC4 commercial laminate inc. underlay and threshold strips43 m²£2,838
Supply and fix new MDF square-edge skirting — primed, pinned, caulked30 LM£900
WC fit-out — tanking, wall tiles, floor tiles, ceiling, plasterboard, skim, WC suite (client supply), basin (client supply), all plumbing and electric1 ITEM£2,520
Deep clean and sparkle clean of entire unit at handover1 ITEM
Section total: £19,204
Sub total (ex. contingency & VAT)£22,557
Contingency (5%)£1,128
Net total (inc. contingency)£23,685
VAT @ 20%£4,737
Total Inc. VAT£28,422
Preliminaries
£768
Demolition
£1,499
Internal & Decoration
£12,223
Contingency (5%)
£725
Total inc VAT
£18,257
Client to supply Mirrors (full-height, 5 no.) · Recessed LED downlight fittings (15 no.) · Pendant lights (5 no.) · Mirror LED strip fittings (5 no.) · Wall panels (8 m²) · Pantry units and worktop · Wallpaper (54 m²)

Note: Option 2 excludes flooring (AC4 laminate) and WC fit-out. These are assumed client-managed or to be added at a later stage.
1 — Preliminaries
Site signage, H&S notices, PPE station (CDM compliant)1 ITEM£132
Dust sheets, containment screens, shopfront glazing protection1 ITEM£180
8yd skip hire — supply, position and collection1 ITEM£456
Section total: £768
2 — Demolition
Disconnect and terminate all existing services safely1 ITEM£216
Strip all existing wallpaper from walls floor to ceiling54 m²£535
Take down existing ceiling in entirety inc. fixings, battens, debris43 m²£748
Section total: £1,499
3 — Internal & Decoration
Repair walls after wallpaper removal — fill, sand, prepare to smooth finish54 m²£745
Supply and install new metal frame suspended ceiling system43 m²£1,471
Fix 12.5mm fire plasterboard to ceiling frame with 3mm skim coat43 m²£1,961
Form decorative recessed niches — timber frame, plasterboard, skim3 no.£684
Hang wallpaper to all walls throughout — labour and adhesive (client supplies paper)54 m²£778
Install wall panels — fit only (client to supply panels)8 m²£173
Mist coat and 2 coats emulsion to new ceiling — Dulux Trade43 m²£748
Mist coat and 2 coats emulsion to walls where wallpaper not applied20 m²£348
Install full-height mirrors — labour, adhesive and fixings (client supplies mirrors)5 no.£480
Supply and install double socket outlet — 1st and 2nd fix15 no.£1,170
Install recessed LED downlights — 2nd fix, labour and connection only5 no.£312
Supply and install 2-gang light switch — 1st and 2nd fix8 no.£528
Install client-supplied pendant lights — back box, cable drop and connection5 no.£390
Install recessed LED strip lights into mirrors — 2nd fix, labour and connection only5 no.£330
TV back box installation and cable relocation1 no.£342
Part P Building Regulations test and certification1 no.£336
Install pantry unit with worktop — fit only (client supply)1 no.£384
Install 2 pantry units no sink — fit only (client supply)2 no.£288
Replace full set of hinges to existing glass shopfront door1 no.£582
Clean all glazing internally and externally1 no.£174
Deep clean and sparkle clean of entire unit at handover1 ITEM
Section total: £12,223
Sub total (ex. contingency & VAT)£14,490
Contingency (5%)£725
Net total (inc. contingency)£15,215
VAT @ 20%£3,043
Total Inc. VAT£18,257
Side by Side

Which option is right for you?

Both options deliver the same finish quality on walls, ceiling and electrics.

Scope Item Option 1 — Full  £28,422 ★ Recommended Option 2 — Core  £18,257
Preliminaries & site setup
Full demolition incl. floor + WC strip-outPartial — no floor/WC
New suspended ceiling (metal frame + board + skim)
Decorative recessed niches (3 no.)
Wallpaper hanging (54 m²)
Wall panel installation (8 m²)
All painting — ceiling and walls
Mirror installation (5 full-height)
Full electrical (sockets, switches, lights, Part P cert.)
Joinery install (pantry units x3)
Shopfront door hinge replacement
AC4 commercial laminate flooring (43 m²)✓ Included✗ Excluded
Full WC fit-out (tanking, tiles, suite, basin, plumbing)✓ Included✗ Excluded
Deep clean at handover

All prices exclude client-supplied items. VAT at 20% included in totals shown.

How We Proceed

Next Steps

We keep it simple. No lengthy process — just clear milestones.

01
Choose Your Option
Confirm Option 1 (full scope) or Option 2 (core scope). We can also price any variations, flooring only add, WC separately, or a phased approach.
02
Sign Off & Deposit
We issue a formal contract. A 30% deposit secures your start date and allows us to order materials and confirm our team.
03
Programme & Access
We produce a simple programme showing start, key milestones and handover. Typical duration for this scope is 3–4 weeks from start on site.
04
Build & Handover
Works proceed to programme. You receive weekly progress updates. Deep clean at completion. Keys handed back — ready to trade.
Let's make this happen

Ready to move forward?

Book a call or send us a message — we'll come back to you within 24 hours.

Phone 07456 505080
Email info@arkadevelopments.com
Website arkadevelopments.com
Floor Plan Viewer
100%
Floor plan
Scroll to zoom  ·  Drag to pan  ·  Esc to close